ST Engineering is laying the groundwork for Singapore’s next generation of ground warfare, moving ahead with a new infantry fighting vehicle (IFV) designed to adapt to evolving battlefield threats.
The next-gen IFV will be built on the company’s Terrex s5 platform, adding to its growing lineup of 8×8 armored vehicles.
It will feature a suite of digitalized systems for improved situational awareness, as well as what the company calls “advanced vehicle electronics” with upgraded firepower.
The platform is also expected to include a cyber-secure Generic Vehicle Architecture, aiming to make it resilient against modern cyber threats.

“The Ministry of Defence’s selection of the Terrex s5 as its next generation IFV reaffirms our ability in designing and building advanced armored mobility platforms,” ST Engineering Land Systems President Lim Kok Ann said.
“With our multi-domain expertise and engineering depth, we are confident that the new IFV will deliver outstanding mobility, advanced smart technologies and unmatched adaptability to support Singapore’s future fighting force.”
Longer Service, ‘Seamless’ Driving
The Terrex s5 runs on a hybrid electric powertrain, capable of moving silently through terrain to reduce the risk of detection.
Built with fewer moving parts than legacy platforms, it also aims for longer service life and easier maintenance.
The vehicle can carry up to 12 soldiers, including two main operators who have access to a multi-mission control station that automatically detects and tracks targets, monitors deployed drones, and manages a 360-degree driving system with pre-set waypoints.

The rear crew compartment can also be reconfigured to fit different seating layouts.
Terrex in Numbers
The Terrex s5 measures 8.5 meters (27.9 feet) long and 3 meters (9.8 feet) wide.
Without a weapon, the platform stands 2.7 meters (8.9 feet) tall and can support a mission payload of up to 13,000 kilograms (28,660 pounds).
“The Terrex s5 will strengthen our portfolio of integrated defense offerings for nations seeking proven and robust solutions to expand their national defense capabilities,” Lim noted.
ST Engineering is scheduled to deliver the IFVs starting in 2028.